Listen carefully: the country is speaking. This dam/regulator should not be cutting off the tributaries from the Lake. This afternoon a section of the bank of the dam/regulator Lake side collapsed and work stopped.
The Fresh Water Embassy encourages the workers to have a good break and the sponsors of the dam/regulator, the SA Government, take a good look at the damage they are doing. It is not too late to stop the work entirely. The first flush has come down the tributaries. The Goolwa Channel has not been overwhelmed with acid. There is no need for the dam/regulator.
Each day the Embassy has a different look.


0 Responses to “31 July 2009: Slumping banks stop work”
Leave a Reply